Understand Status Labels
Automation status labels show where a rule, check, alert, action, or provider change is in its lifecycle. Evidence labels explain what Nitoriq knows about the target and the requested change.
Use this guide when an Activity row, dashboard card, or rule detail label needs interpretation.
Rule And Schedule Status
| Label | Meaning |
|---|---|
| Draft | The rule is saved but not active for scheduled execution. |
| Active | The rule can run on schedule and can be run manually with Run now. |
| Paused | The rule is stopped but can be activated later. |
| Archived | The rule is retired from normal operation. |
| Schedule off | The rule has no enabled schedule. |
| Backoff | Scheduling is temporarily delayed after an operational failure. |
| Running now | Nitoriq is evaluating or dispatching the rule. |
| Waiting for first run | The rule is active but has not recorded a check yet. |
Check And Action Status
| Label | Meaning |
|---|---|
| Planned action | A target matched and Nitoriq prepared an action. |
| Pending or queued | Eligible work is waiting for durable execution. |
| Executing | A worker has claimed the action and is processing it. |
| Executed action | Nitoriq sent or completed the requested action. |
| Confirmed | Provider state was read and confirmed after execution. |
| Skipped | The action did not execute because an eligibility, safety, setup, or data check prevented it. |
| Failed action | Nitoriq attempted the check, notification, or action and it failed. |
| Accepted unconfirmed | The provider may have accepted the change, but Nitoriq could not confirm the final state yet. |
| Needs verification | A follow-up provider read is required before success can be trusted. |
| Cancelled | The run, attempt, or recovery tracking was intentionally stopped. |
Historical Approval Status
Older Activity records can show approval-related labels such as Pending,
Approved, Rejected, Expired, or Cancelled. These labels describe an
earlier automation workflow. Historical approval events are read-only; there
is no current approval queue and they cannot execute.
Evidence Signals
| Signal | What to check |
|---|---|
| Campaign identity | Whether the Nitoriq campaign has an exact account-scoped binding to the intended provider campaign. |
| Verification method | Whether the campaign was verified through a niq_map URL claim, trusted Nitoriq redirect, or restricted exact-ID fallback. |
| Control readiness | Whether the provider connection, account, permissions, and action support are ready. |
| Freshness | Whether cost, conversion, campaign-identity, or provider evidence is recent enough for the rule. |
| Safety checks | Whether cooldowns, execution windows, daily caps, run caps, and numeric safeguards passed. |
| Provider request ID | The provider request or operation reference, when available. |
| Idempotency key | The stable key Nitoriq uses to avoid duplicating the same provider change. |
| Before/requested/after snapshots | Evidence used to audit what Nitoriq intended to change and what the provider reported afterward. |
Read a status safely
Identify the object
First decide whether the label belongs to a rule, schedule, check, alert, action, provider change, campaign identity, or recovery item. The same word can have different risk depending on the object.
Read the detail evidence
Open Activity or the rule detail page. Use the status as a pointer, not the complete explanation.
Check evidence before provider changes
For provider actions, confirm the exact campaign identity, control readiness, freshness, safety checks, and change evidence. Do not rely on a metric snapshot alone when the action changes spend or delivery.
Treat unconfirmed changes as unresolved
Needs verification, Accepted unconfirmed, and Pending confirmation mean
Nitoriq has not fully confirmed provider state. Use recovery controls or review
the provider before assuming the action succeeded.
Was this page helpful?